Wind Turbine Installation Vessel (WTIV)
Maersk Wind Turbine Installation Vessel
Post weld heat treatment of pipe joints and pre-heating of the leg structure.

About the vessel
Our work on Maersk Wind Turbine Installation Vessel.
This will be the first WTIV for both Sembcorp Marine and Maersk Supply Service. The vessel, ordered by Maersk from Sembcorp Marine in March, will be chartered by Empire Offshore Wind, a joint venture between Equinor and BP, and will be used for the installation of 15MW Vestas wind turbines at the Empire Wind offshore wind project in the U.S.
- Client
- Seatrium SG Pte Ltd
- Scope
- Carry out Post Weld Heat Treatment on pipe joints and pre-heating on Leg Structure.
- Duration
- Ongoing (as stated in the 2026 company profile)